Project Overview
Civil Nuclear Constabulary (CNC) based at Sizewell B Power Station had outgrown their existing facility which had fallen into a degraded state of repair. This required a refurbishment and reconfiguration of the ground floor to open up more space accommodating Covid-19 restrictions. Dalkia were successfully awarded the contract for this multi-discipline project tasked with the electrical, mechanical, builder’s works and civil elements.