Following an initial Front End Engineering Design Study (FEED) Study to identify any risks of SCADA Failure to the owners and operators of a 600MW offshore windfarm, Capula issued recommendations of how to upgrade and replace the existing systems and re-life until end of licence agreement of the windfarm.
The outputs of this study will be a fully specified and optimal system proposal providing the windfarm project with a cost-effective solution, enhancing the existing windfarms’ infrastructure, extending asset life and optimising for future interoperability.