Working at the prestige London office space, in parallel with our specialist contractors, we isolated the whole building and carried out intrusive technical maintenance (electrical, mechanical, and structural) under the Dalkia Managed Safe System of Works. This included maintaining the following to the highest standard: two High Voltage Intake Switchboards, two Cast Resign Transformers, Low Voltage Main Switchboards, Life Safety Switchboards, Generator Control Switchboards, and Local Distribution Boards.
Following the maintenance, our expert team undertook a full black building test to ensure the building’s resilience. Utility power was switched off and the generators were left to support the buildings critical load.
“This was a seamless service delivery of critical intrusive maintenance by the Dalkia Team and our Specialist Contractors. Under fully isolated conditions, we were able to demonstrate our technical know-how of the building’s infrastructure and overcome any unforeseen challenges. I’d like to thank the Dalkia Engineers for their fantastic teamwork!
Lee Feighhery, Technical Manager, Dalkia