Preparing the site
We performed the enabling works forming Phase 3 of the new build/refurbishment upgrade of the existing basement, plant room and sorting offices, ground floor extensions, west and north car parks and Block G new build. The works included the design, supply, strip out, installation and commissioning of the MEP services, including general power, lighting, HV alterations and LV supplies with standby generator, smoke extract systems, sprinklers systems, fire systems, domestic services, above-ground drainage, VRV, heating and cooling systems.