Project Overview
The works had six sectional completions, including the internal demolition, structural alterations and reconfiguration of existing floor plates. As the buildings and internal finishes were Grade II listed, specific attention to areas of historic significance had to be planned ahead of the project execution. A key objective was to retain as much of the concrete structural frame and existing façade, with new external penetrations being minimised.